Description | Regions | Market Segment |
---|
ELM26 – MULACH B Jacket Installation, Mexico 
| Americas | Grouting Installation ServicesPile Sleeve Grouting Services |
Jacket Installation with Grouted Pile-Sleeve – ELM-16 PTX, Mexico 
| Americas | Grouting Installation ServicesPile Sleeve Grouting Services |
DIAVAZ MALOOB-B Grouted Clamps, Mexico 
| Americas | Repair & Strengthening Solutions |
SHWE Project Phase 3 Development – Services for Skirt Pile Grouting, Myanmar 
| South East Asia | Grouting Installation ServicesPile Sleeve Grouting Services |
Batangas Dolphin Grouting, Philippines 
| South East Asia | Grouting Installation ServicesPile Sleeve Grouting Services |
Darat Well S-485 Plugging, Brunei 
| South East Asia | Well Integrity Solutions |
Penglai 19-3 oilfield WHPC platform jacket crack repair and strengthening project, China 
| East Asia | Repair & Strengthening Solutions |
LEWPP-2 Platform Under Water Repair, India 
| India | Repair & Strengthening Solutions |
Underwater Structural Repair of HC Platform, India 
| India | Repair & Strengthening Solutions |
Design of Jetty Pile Repair using Grouted Clamps, Turkey 
| Europe | Repair & Strengthening Solutions |
GOODWYN-A Platform Flare Tower Legs Grouting, Australia 
| Australasia | Grouting Installation ServicesPile Sleeve Grouting Services |
LAM 13 & 75 Platform Grouting Works, Turkmenistan 
| Middle East & Africa | Repair & Strengthening Solutions |
Underwater Jacket Repair at B55 Platform Under B127 Cluster Pipeline RTR Project, India 
| India | Repair & Strengthening Solutions |
Provision of Grouting Services for Installation of Zawtika Phase 1C Jackets, Myanmar 
| South East Asia | Grouting Installation ServicesPile Sleeve Grouting Services |
Libro Platform and Conductor Integrity Assessment and Strengthening, Philippines 
| South East Asia | Repair & Strengthening SolutionsWell Integrity Solutions |