UHPC Grouting of Tow Joint, Premier Oil, Dubai

2022-11-09T21:45:08+08:00

In February 2014, Nautec was appointed by Dry Docks World Dubai to undertake the planning, preparation and pumping of NaX® UHPC grout into 10 towing point elbow joints. These elbow joints were later mounted onto a large subsea oil storage facility, destined for Premier Oil’s Solan Field Development in the UK. The Client Nautec [...]

UHPC Grouting of Tow Joint, Premier Oil, Dubai2022-11-09T21:45:08+08:00

Supervision of Drilling, Inspection and Annulus Grouting of Jacket Legs

2022-11-09T21:01:41+08:00

In February 2012, Nautec was contracted to carry out the supervision of drilling and inspection of jacket legs and grouting of the jacket legs annulus at the LAM-22 facilities Wellhead Platform, approximately 34km offshore Cheleken Harbour in the Caspian Sea. The Client Dragon Oil (Turkmenistan) Ltd. The Scope To carry out the supervision of [...]

Supervision of Drilling, Inspection and Annulus Grouting of Jacket Legs2022-11-09T21:01:41+08:00

Strengthening of Marine Pile at Tarut Bay

2022-11-07T21:03:12+08:00

Nautec worked together with Murjan Al-Sharq for Marine Services to carry out the marine pile strengthening work at Tarut Bay, Ras Tanura, Kingdom of Saudi Arabia (KSA) with a high performance grout NaX® Q140 for Saudi Arabian Oil Company. Nautec Disciplines Providing structural strengthening of members through infill grouting. The Client Nautec worked together [...]

Strengthening of Marine Pile at Tarut Bay2022-11-07T21:03:12+08:00

Jacka Resources: Phase 2 Unconventional, Potential of Tanzania (2013)

2015-10-27T10:29:24+08:00

Nautec was engaged by Jacka Resources Limited (Jacka) to undertake an estimation of Coal Seam Gas (CSG) and Gas In Place (GIP) for three coalfield (sub-basin) areas of the Ruhuhu Rift Basin in south west Tanzania: Mchuchuma, Mbalawala, and Mbuyura. The three areas were targeted for coal exploration by the Colonial Development Corporation (CDC) in [...]

Jacka Resources: Phase 2 Unconventional, Potential of Tanzania (2013)2015-10-27T10:29:24+08:00

Energy Botswana: CBM Potential of Botswana (2012)

2015-10-27T10:26:36+08:00

Nautec was contracted by Energy Botswana Limited (EBL) to complete a geological review of their wholly owned subsidiary Nata Energy’s coal seam gas (CSG) exploration permits in Botswana. The review was commissioned to rank the permits and to generate prospective areas. Nata Energy held the CSG rights over five petroleum licenses in central Botswana (PL352/2008 [...]

Energy Botswana: CBM Potential of Botswana (2012)2015-10-27T10:26:36+08:00

Technical Roadmap and Gap Analysis, Review of Makhul Shale Kuwait for KOC

2015-10-27T10:23:31+08:00

Kuwait Oil Company (KOC) invited Nautec to present at a 2 day workshop in Kuwait, to demonstrate the methodology for conducting a hydrocarbon in place (HIP) assessments of Kuwait’s Shale Gas resources including: Identify a potential Shale Gas play (source rock) Establish the areal extent and thickness Define the prospective area (limits and cut-offs e.g. [...]

Technical Roadmap and Gap Analysis, Review of Makhul Shale Kuwait for KOC2015-10-27T10:23:31+08:00

Field Development / Refurbishment Study, GNPOC Joint Venture Heglig Oil Field, Onshore Southern Sudan

2015-10-27T10:16:16+08:00

The Heglig field is operated by GNPOC – the Greater Nile Petroleum Operating Company. Despite the field achieving an oil production rate of 50K bpd, the field water cut rose to an alarming 250K bpd – a serious production impediment. Amidst competition from numerous EMP companies, Nautec in partnership with PETRONAS successfully won the contract to [...]

Field Development / Refurbishment Study, GNPOC Joint Venture Heglig Oil Field, Onshore Southern Sudan2015-10-27T10:16:16+08:00

Jacka Resources: Phase 1 Unconventional Potential of Tanzania (2013)

2015-10-27T08:21:45+08:00

Nautec was engaged by Jacka Resources Limited (Jacka) to conduct a preliminary review of the data inventory of the Ruhuhu Basin, Tanzania - an area of approximately 150 kilometres in length and up to 35 kilometres wide (Phase 1 of the project). Coal mining and exploration has been conducted for at least 60 years. In [...]

Jacka Resources: Phase 1 Unconventional Potential of Tanzania (2013)2015-10-27T08:21:45+08:00