P&A Well Trial in Bondoola, Queensland, Australia

2023-09-29T18:05:51+08:00

Quick Facts: Type of work: End of life plug & abandonment (P&A) oil well cement trial Location: Queensland, Australia Client: Central Queensland Exploration (CQE) Collaborators: The University of Queensland (UQ) and the State Regulator (DNRME) Materials: NaX® WP19 Oil Well Cement Project date: July 2017 As part of the SPRING project, Nautec [...]

P&A Well Trial in Bondoola, Queensland, Australia2023-09-29T18:05:51+08:00

GOODWYN-A Platform Flare Tower Legs Grouting, Australia

2022-11-22T17:32:02+08:00

Nautec has completed its grouting services of the Goodwyn-A (GWA) Platform 4 Flare Tower Legs for which they were contracted by Australian oil and gas company Woodside Energy Ltd. The work was carried out by pumping NaX® grout up 85 meters height using the conventional “bottom to top” methodology and it was [...]

GOODWYN-A Platform Flare Tower Legs Grouting, Australia2022-11-22T17:32:02+08:00

Detail Finite Element Analysis for Offshore Tower Strengthening, Australia

2022-10-03T17:16:11+08:00

Detailed engineering design was carried out in 2011-2012 for structural strengthening of an offshore tower to accommodate additional loading caused by higher metocean criteria.   Project Scope Analysis and design of strengthening for offshore flare tower, Goodwyn A-Platform. The engineering works involved the assessment of load capacity increase by grouting of tower leg using Ultra [...]

Detail Finite Element Analysis for Offshore Tower Strengthening, Australia2022-10-03T17:16:11+08:00

Subsea Riserless Light Well Intervention

2018-04-02T02:00:59+08:00

In January 2016, SapuraKencana Well Services requested well intervention engineering support from Nautec Energy Solutions to enable them to carry out a riserless light well intervention (RLWI) for a major operator. The well operator’s tubing retrievable safety valve (TRSV) was inoperative in the closed position, presumed to be stuck rather than defective, thus preventing well [...]

Subsea Riserless Light Well Intervention2018-04-02T02:00:59+08:00

Design of a Portable Cabin for Water Draw Calibration, Russia

2018-04-02T02:03:42+08:00

Having completed the design of Oil Metering and Prover skids for Yamal LNG Oil Metering System, Russia, as a subcontractor to Emerson Asia Pacific, Nautec received the order from Hai Leck Engineering, a contractor of Emerson, for the design of a portable cabin to facilitate water draw calibration of the prover with minimum ambient of [...]

Design of a Portable Cabin for Water Draw Calibration, Russia2018-04-02T02:03:42+08:00

Multilateral Well Completion

2018-04-02T02:04:59+08:00

From July 2015 to June 2016 Nautec was involved in the completion operations planning, equipment inspection and preparation and on-site supervision for multilateral horizontal oil production wells in the Wandoo field offshore Western Australia.  The Field  The Wandoo field is located in the Carnarvon Basin offshore Western Australia and has been developed with two production [...]

Multilateral Well Completion2018-04-02T02:04:59+08:00

Plug and Abandonment of HPHT Wells in the Cooper Basin, Australia

2018-04-02T02:20:17+08:00

The Scope  Nautec provided well site supervision and field engineering support throughout the three well abandonment campaigns. Throughout each activity, regular Pre-Job Safety Meetings and Health Safety and Environment briefings were conducted. Supervision activities included rig up/downs, wireline intervention, fishing, tubular retrieval and cementing activities. Engineering services included well abandonment program review, risk assessment and [...]

Plug and Abandonment of HPHT Wells in the Cooper Basin, Australia2018-04-02T02:20:17+08:00

Pumpability Test of UHPC Grout for Goodwyn-A Flare Tower Strengthening

2022-11-10T21:26:55+08:00

In August 2012 Nautec carried out Pumpability Tests of UHPC grout for the strengthening of Goodwyn-A Flare Tower. Woodside Energy Ltd were studying the available strengthening options for the flare tower legs of the Goodwyn-A platform and engaged Nautec to carry out finite element analysis (FEA) of the entire flare tower. The Scope Analysis [...]

Pumpability Test of UHPC Grout for Goodwyn-A Flare Tower Strengthening2022-11-10T21:26:55+08:00

TerraNova: 3D Acquisition, Cooper Basin, Australia (2013)

2015-10-28T01:56:43+08:00

From August 2013 to November 2013, Nautec supervised Dolphin Geophysical to process approximately 80 square kilometres of 3D land data for Terra Nova in PEL 444 and AAL 193, located in the Cooper Basin, Australia. The Scope The two-way-time to the primary target is from 800 ms to 1800 ms, to image low-relief structural and [...]

TerraNova: 3D Acquisition, Cooper Basin, Australia (2013)2015-10-28T01:56:43+08:00

Senex: Review of Potential Drilling Locations, Cooper Basin, Australia

2015-10-28T01:52:32+08:00

Nautec Energy Solutions (Nautec) was contracted by Senex Energy Ltd (Senex) to complete a review of the remaining conventional hydrocarbon prospectivity of the Birkhead Formation and Permian section of permits PRL-109 and PRL-110. Wells and vintage seismic data were evaluated and interpreted in an attempt to identify channel sandstones and other stratigraphic plays and potential [...]

Senex: Review of Potential Drilling Locations, Cooper Basin, Australia2015-10-28T01:52:32+08:00