Provision of Grouting Services for Wind Farm Høgsted

2024-01-10T22:00:20+08:00

Quick Facts: Type of work: Onshore installation Location: Høgsted, Denmark Materials: 17.5 tonnes NaX® Q130 UHPC Grout Turbine: 5 x Vestas V117 3.3MV Project date: Feb 2017 Oestermark Grouting A/S and Nautec has completed the installation of 5 units of Vestas V117 Wind Turbines in the North Western part of Denmark.   [...]

Provision of Grouting Services for Wind Farm Høgsted2024-01-10T22:00:20+08:00

Design of Jetty Pile Repair using Grouted Clamps, Turkey

2022-11-22T17:52:49+08:00

The Client requested Nautec to complete detailed engineering studies to assess the structural integrity of jetty piles. The survey and assessment was followed by reinforcement design and repair of the compromised piles using Nautec’s NaX® technology and high performance grouting materials with focus on transferring load across the weakened/damaged sections using grouted [...]

Design of Jetty Pile Repair using Grouted Clamps, Turkey2022-11-22T17:52:49+08:00

Installation of 5 units of Vestas V117 Wind Turbines

2018-04-02T02:02:50+08:00

Oestermark Grouting A/S and Nautec has completed the installation of 5 units of Vestas V117 Wind Turbines in the North Western part of Denmark.  The Scope Supply of NaX™ Q130 Ultra High Performance Cementitious (UHPC) grout and all materials, equipment and accessories associated with the mixing; pumping and grouting installation services. The Services Supply of grouting [...]

Installation of 5 units of Vestas V117 Wind Turbines2018-04-02T02:02:50+08:00

Design of a Portable Cabin for Water Draw Calibration, Russia

2018-04-02T02:03:42+08:00

Having completed the design of Oil Metering and Prover skids for Yamal LNG Oil Metering System, Russia, as a subcontractor to Emerson Asia Pacific, Nautec received the order from Hai Leck Engineering, a contractor of Emerson, for the design of a portable cabin to facilitate water draw calibration of the prover with minimum ambient of [...]

Design of a Portable Cabin for Water Draw Calibration, Russia2018-04-02T02:03:42+08:00

Drilling Project Management, Remote Area Capability, Aleator Energy Limited

2015-10-27T07:38:46+08:00

The Povorotnoye gas field in the Crimean Peninsula was discovered in 1985 using Soviet-era drilling methods, where sub-optimal bit types and very basic drilling muds were used. This drilling process was very inefficient and ineffective, resulting in more than 500 days of drilling for each well. In 2012, Aleator Energy Limited (Aleator) assumed operatorship and [...]

Drilling Project Management, Remote Area Capability, Aleator Energy Limited2015-10-27T07:38:46+08:00