Salman Jacket Leg Grouting, Brunei

2023-12-19T18:05:28+08:00

Quick Facts: Type of project: Greenfield Location: MCY Yard, Kuala Belait, Brunei Materials: 24 MT of NaX® Q110 Client: Massutera Engineering Sdn Bhd Project date: December 2020 Disciplines Onshore grouting work Supply of grouting material and equipment Supply of certified grouting personnel About the Project The first onshore grouting of a new-build Jacket [...]

Salman Jacket Leg Grouting, Brunei2023-12-19T18:05:28+08:00

CP-240 Conductor Annulus Repair, Brunei

2023-12-19T17:57:06+08:00

Quick Facts: Type of project: Brownfield Location: CPDP-33 Offshore (East Area), Brunei Materials: 1.5 Mt NaX® B210 Client: Brunei Shell Petroleum Company Sdn Bhd Project date: May- June 2019 Grouting days: 16 days Water depth: 38.09m Nautec was contracted by Brunei Shell Petroleum for the supply of UHPC grout material, epoxy sealant [...]

CP-240 Conductor Annulus Repair, Brunei2023-12-19T17:57:06+08:00

HESS North Malay Basin Phase 4A Skirt Pile Grouting, Malaysia

2023-09-13T14:41:55+08:00

Quick Facts: Type of project: Greenfield Location: North Malay Basin, Offshore Kelantan, Malaysia Materials: 93 Mt NaX® Q80 High-Performance grout Client: HESS Exploration and Production Malaysia B.V. Project date: November 2022 Water depth: 64 m Nautec was engaged by Sapura Offshore Sdn Bhd to perform Skirt Pile Grouting during the installation of [...]

HESS North Malay Basin Phase 4A Skirt Pile Grouting, Malaysia2023-09-13T14:41:55+08:00

AMPA-06 TRUSS REPAIR PROGRAMME, BRUNEI

2023-09-07T19:27:04+08:00

Quick Facts: Type of project: Brownfield Location: AMPA Field, Brunei Materials: 20 Mt of NaX® Q140-E UHPC Client: Brunei Shell Petroleum Grouting days: 3 days Project date: August 2022 Nautec has carried out the repair and strengthening of truss and the adjoining tubular members on AMDP-06 platform based on a structural integrity [...]

AMPA-06 TRUSS REPAIR PROGRAMME, BRUNEI2023-09-07T19:27:04+08:00

BERTAM–A, LEG REPAIR BY GROUTED CLAMP, MALAYSIA

2023-08-28T18:03:00+08:00

Nautec was contracted by ECMS Resources Sdn Bhd for the supply of engineering services, NaX® Q140-E UHPC grouting materials and fabrication and installation of an extremely complex precision engineered Grouted Clamp at Bertam Well Head Platform, located in the Bertam Oilfield, approximately 160 km off the shore of Kuantan in Peninsular Malaysia. [...]

BERTAM–A, LEG REPAIR BY GROUTED CLAMP, MALAYSIA2023-08-28T18:03:00+08:00

SHWE Project Phase 3 Development – Services for Skirt Pile Grouting, Myanmar

2023-04-25T15:21:13+08:00

Nautec was engaged by Hyundai Heavy Industries CO., LTD to supply grout material and grouting services for the skirt pile grouting of the Low Pressure Compression Platform.  The Low Pressure Compression Platform comprises Gas Compressor topside modules and a 4 legged jacket with two skirt piles each. Scope of Work / Services [...]

SHWE Project Phase 3 Development – Services for Skirt Pile Grouting, Myanmar2023-04-25T15:21:13+08:00

Batangas Dolphin Grouting, Philippines

2023-04-21T15:01:49+08:00

Engaged by McConnell Dowell, Nautec supplied the grouting materials, equipment and crew required for the F-GEN Multi-Purpose Jetty and Gas Receiving Facility Project at Batangas, Philippines.  The grouting team pumped approximately 3,900mt of NaX® Q80-R High Performance Cementitious grout; a product developed for offshore pile-sleeve and main pile grouting, which limits heat [...]

Batangas Dolphin Grouting, Philippines2023-04-21T15:01:49+08:00

Darat Well S-485 Plugging, Brunei

2023-03-08T18:30:40+08:00

Well inspections carried out by Brunei Shell Petroleum (BSP) revealed that several wells were suffering from corrosion, on some occasions leading to local bulking failure of outer casings, a serious threat to the integrity of the wells. BSP initiated a mitigation scheme and contracted NAUTEC to carry out corrosion protection of the [...]

Darat Well S-485 Plugging, Brunei2023-03-08T18:30:40+08:00

Provision of Grouting Services for Installation of Zawtika Phase 1C Jackets, Myanmar

2022-10-28T19:42:37+08:00

The Zawtika Project is a gas field development project located in the Gulf of Moattama, Myanmar. The development area covers Block M9 and small portion of Block M11, owned by Myanmar Oil & Gas Enterprise (MOGE). The field lies approximately 300 km south of Yangon and 290 km west of Tavoy on [...]

Provision of Grouting Services for Installation of Zawtika Phase 1C Jackets, Myanmar2022-10-28T19:42:37+08:00

Libro Platform and Conductor Integrity Assessment and Strengthening, Philippines

2022-10-28T16:56:19+08:00

In May 2018, the client required Nautec to propose suitable repair and strengthening of the platform for the purpose of plug and abandonment of the wells, whereby the conductors were to achieve a nominal pressure rating of 500psi. Scope To carry out repair and strengthening to the badly corroded platform in order [...]

Libro Platform and Conductor Integrity Assessment and Strengthening, Philippines2022-10-28T16:56:19+08:00