Nautec has completed the structural repair of a breasting dolphin pile for a major Saudi Arabian Asset owner.
The structural repair of the pile was carried out by grouting with NaX™ ultra-high strength grout and the analysis and design of the repair methodology of the pile was carried out in-house by Nautec’s engineering team.
Nautec provided its own small footprint spread; all materials and accessories as well as engineer and crew for carrying out the grouting work.